Completed Projects

06/02-06/03

Eddy Theatre, Chatham College, Pittsburgh, PA

 

Theatre Consultant/Project Manager:  Bob Steineck & Assoc., Inc.

Project: Stage rigging renovations completed in two phases

Scope of Work: Design and project manage the installation of  1) a new fire curtain; 2) new counterweight rigging and dead hung line sets; 3) new manual winch sets and new curtains.

click here for pictures

03/03-04/03

Woodland Hills High School, Woodland Hills School District, Pittsburgh, PA

 

Firm: Bob Steineck & Associates, Inc.

Project: Stage rigging evaluation and recommendations

Scope of Work: Perform a stage rigging inspection and report including

photo documentation.  Provide recommendations and budget pricing.

03/02-12/02

Willow Valley Cultural Center, Willow Valley Lakes Manor, Willow Street, PA

 

Theatre Consultant: Bob Steineck & Associates, Inc.

Project: Construction of Cultural Center complex including multipurpose performance auditorium.

Scope of Work: To date, submission of final designs, layout and equipment specifications for stage lighting and rigging systems.  

 

03/00-08/02

Butler County Community College, Butler, PA

 

Bob Steineck & Associates, Inc. is the theatre consulting firm for the new Performing Arts Center Stage systems including: stage lighting, dimming and control, theatre rigging and curtains, fly rail, and gridiron.  Additional input included facility layout and design issues.

Project: Construction of a science, technology and theatre complex for Butler County Community College, Butler, PA

Scope of Work: Design and inspect stage lighting, dimming and control, theatre rigging and curtains, fly rail, fly floor, projection booth and gridiron.  Additional input included facility layout and design.

12/01

Franklin Regional High School, Murrysville, PA

 

Project: Renovation and expansion of the senior high school, including a new theatre facility.

 

Bob Steineck & Associates, Inc. was contracted by the owner, Franklin Regional School District, to evaluate the theatre design and its various systems. Upon, completion, my firm was retained to study the installed stage lighting, rigging and sound systems as well as sightlines involving the balcony and its railing.

Scope of Work: To date, my firm has completed 1) a study of the stage rigging and stage lighting system; 2) design and project management of on a newly installed steel loading bridge for the rigging system at a design and construction. 

10/99-02/00

Chatham College, Eddy Theatre, Pittsburgh, PA

 

Primary Consulting Firm: Bob Steineck & Associates, Inc.

Project: Comprehensive study of the Eddy Theatre, its physical plant and theatrical systems.  The plan addresses renovation and possible expansion, ADA and patron amenities, dressing room facilities, storage and loading.

Bob Steineck & Associates, Inc. was contracted by the owner, Chatham College, to complete a study and propose recommendations for the Eddy Theatre.

 

 

Scope of Work: To date, my firm has completed a study of the stage and physical plant for the Eddy Theatre.

05/97

Kiski Area High School, North Huntington, PA

 

Primary Architectural Firm: Canzian/Johnston & Associates, New Kensington, PA

Project: High school renovation

Bob Steineck & Associates, Inc. was contracted by the owner to

review and revise the Architect’s specifications for new stage lighting and rigging equipment

 

04/88-12/89

 

The Pennsylvania State University, Altoona. PA

 

Project: Community Arts Center Pennsylvania State University, Altoona Campus, Altoona, PA

Total construction budget: $2.5 million

Bob Steineck & Associates, Inc. was contracted by the owner DGS and the Altoona Campus to design, specify and project manage the stage lighting, rigging and sound systems for the facility and coordinate with the primary architect and engineers the details of the stage systems and their installation.

Scope of Work: Designed, specified and managed the lighting, rigging, sound systems for new 400-seat Margery Kuhn Performing Arts Center